Cemented EnerFrac™ Ball-Drop System Cardium

Cemented EnerFrac™ Ball-Drop System Cardium

Tartan Completes a 51-stage Cemented EnerFrac™ Ball-Drop System in the Cardium. OBJECTIVE An intermediate Canadian producer operating in the Cardium, wanted to capture the production advantages of a cemented completion system that was reliable and cost effective. The...
MultiFrac Limited Entry Ball-Drop System

MultiFrac Limited Entry Ball-Drop System

Tartan Cemented MultiFrac Limited Entry Ball-Drop System Reduces Stimulation Time by 5 Days per Well Compared to Plug-and-Perf in the D-J Basin OBJECTIVE A Colorado-based independent operator working in the Denver-Julesburg (D-J) Basin in Weld County wanted to...
MultiFrac™ Utica

MultiFrac™ Utica

Tartan Cemented MultiFrac Limited Entry Ball-Drop Systems Increase Production by 12.5% in the Utica OBJECTIVE A major operator exploiting the Utica shale formation wanted to maximize stimulated rock volume on their most extended reach horizontal wells. They were lo o...
Hybrid Completions

Hybrid Completions

Tartan Provides Reliable and Efficient Completion of Deepest Stages in Hybrid Extended Reach Horizontals OBJECTIVE In most North American oil and gas plays, the exploitation trend is to drill longer horizontal wells and stimulate with more stages. Completion methods...
MultiFrac™ D-J Basin

MultiFrac™ D-J Basin

Tartan MultiFrac™ Systems Successfully Stimulated 18 Months Post-Install OBJECTIVE An operator working in the Denver-Julesburg (D-J) Basin acquired two wells completed in September 2015 with Tartan cemented MultiFrac™ systems. Targeting the Niobrara formation chalks...
Initiation Assembly D-J Basin

Initiation Assembly D-J Basin

Tartan Cemented Initiation Assembly Enables Reliable Toe Initiation and First Stage Stimulation in Extended Reach Horizontals OBJECTIVE Operators using cemented plug-and-perf methods for their extended reach horizontals face the challenge of efficiently and reliably...